United Ductile Industries Sdn Bhd (UDI) was established in 2007 by a strong team of highly experienced technical personnel to provide a complete Ductile Iron pipe system complying with BS EN 545:2010 for waterworks and BS EN 598:2007 +A1:2009 for sewerage sector.

From its humble beginnings as a Ductile Iron pipe re-engineering specialist, UDI has expanded the business horizon embarking as a prominent Ductile Iron pipeline solution provider these days. For almost a decade, UDI’s passion in the Ductile Iron industry remains. The UDI team is single-minded in their determination, fulfilling the growing demand from waterworks and sewerage industries within Malaysia and the ASEAN region.

Their comprehensive product range comprises the Ductile Iron pipes, fittings and accessories, carrying the UDI brand name. As an emerging player in waterworks and sewerage industries, UDI strives to provide products and services of the highest quality and the greatest possible value to the customer, thereby gaining and holding their respect and loyalty.

HISTORY

2007

Establishment of UDI specialization in Ductile Iron pipe flanging

2009

Active player in waterworks and sewerage industries distributing Ductile Iron pipes of renowned brand

2012

Introduction of UDI Ductile Iron fittings and accessories | SPAN registered material supplier

2015

Introduction of UDI Ductile Iron socket-spigot pipes

A complete solution provider for Ductile Iron water and sewerage systems

evolution through time

PROJECTS

JUN 2017

PROJECT TITLE:

Sawah Raja Water Treatment Plant,
Phase 2, Negeri Sembilan Darul Khusus.

SIZES:

DN900, DN600

JUL 2017

PROJECT TITLE:

Loji Rawatan Air Sg. Lebam dan
Sistem Agihan, Johor Darul Takzim

SIZES:

DN600, DN450, DN300

JUL 2017

PROJECT TITLE:

Water Reticulation at
Kaysone Phomvihane District,
Lao PDR for Savan 鈥?DKLS Water
Supply Co. Ltd. (SDWS), Laos

SIZES:

DN200

SEP 2017

PROJECT TITLE:

Pembinaan Kolam Air
Baru Bukit Bahudin, Daerah Jasin, Melaka

SIZES:

DN600, DN450

OCT 2017

PROJECT TITLE:

Upgrading Water Treatment Plant
at Bukit Serampang, Johor Darul Takzim

SIZES:

DN700, DN600, DN300

DEC 2017

PROJECT TITLE:

Projek Pembinaan Loji Rawatan
Air Labohan Dagang,
Daerah Kuala Langat,
Selangor Darul Ehsan

SIZES:

DN2000, DN1600,
DN1200, DN600, DN400

 

 

 

 

 

 

 

 

 

 

JAN 2018

PROJECT TITLE:

Refurbishment &
Upgrading Work for
Putrajaya STP 2 M1

SIZES:

DN700, DN500, DN300

 

 

 

 

 

 

 

 

 

 

JAN 2017

PROJECT TITLE:

Pembinaan Loji Rawatan Kumbahan
Sub-Serantau Upper Kerayong
di Zon 1 鈥?Taman Maluri C dan
Zon 3 鈥?Taman Lembah Maju,
Selangor Darul Ehsan

SIZES:

DN700, DN600, DN400

MAY 2017

PROJECT TITLE:

Paip Kumbahan dan Penyambungan
kepada Premis-premis di Kota Bahru, Kelantan
(Reka & Bina) K11, Kota Bahru,
Kelantan Darul Naim

SIZES:

DN200

JUL 2017

PROJECT TITLE:

Pakej D44 – Cadangan Pembinaan
Rangkaian Paip Pembetungan dan
Rasionalisasi di Bunus,
Kuala Lumpur (Reka & Bina) –
AMA052 Pump Station

SIZES:

DN900, DN700, DN350

JUL 2017

PROJECT TITLE:

Sewage Pumping Station Cyberjaya PS2-9

SIZES:

DN1000, DN700, DN600,
DN300

OCT 2017

PROJECT TITLE:

Pembinaan Akademi Bola Sepak Negara
(Fasa 2) and the Sewerage Pipework,
Gambang, Pahang Darul Makmur

SIZES:

DN80

OCT 2017

PROJECT TITLE:

Loji Rawatan Kumbahan Serantau
di Bayan Baru, Pulau Pinang (Fasa 2)

SIZES:

DN1800, DN1500, DN1400,
DN1200, DN800, DN700

JAN 2016

PROJECT TITLE:

Loji Rawatan Air Kumbahan Berpusat
dengan Kapasiti 150,000PE di Lot 201216
& PTB 20476, Sungai Segget, Johor Bahru,
Johor Darul Takzim

SIZES:

DN500, DN450, DN350, DN300

APR 2016

PROJECT TITLE:

Southkey City STP, Taman Sentosa,
Mukim Plentong, Johor Bahru,
Johor Darul Takzim

SIZES:

DN700, DN600, DN400, DN200

MAY 2016

PROJECT TITLE:

Sewage Pumping Station and
Force Main for Cadangan Tambahan dan
Menaik Taraf Stadium Bolasepak Cheras,
Kuala Lumpur

SIZES:

DN350

SEP 2016

PROJECT TITLE:

Pakej 49 – Pembinaan Rangkaian
Paip Pembetungan di Kajang 1 dan Kajang 3,
Kajang, Selangor Darul Ehsan
(Reka dan Bina)

SIZES:

DN700

SEP 2016

PROJECT TITLE:

Langat Centralised Sewage
Treatment Plant (CSTP),
Selangor Darul Ehsan

SIZES:

DN1200, DN250, DN200, DN150, DN80

OCT 2016

PROJECT TITLE:

Proposed Upgrading of Existing ITPS
(KLR090) to a 15,000 PE IPS and Lay
350mm Diameter DI Forcemain Along Jalan Tiram /
Jalan Arasakesari / Jalan Arasakesari 3 /
Jalan Waras / Jalan Ahliman / Jalan Ahliman 1 /
Lebuhraya Connaught-Cheras Connected to
Existing Plant ALPS (KLR115) and Minimum
Refurbishment to KLR115, Selangor Darul Ehsan

SIZES:

DN350

NOV 2016

PROJECT TITLE:

Cadangan Kerja-Kerja Menaiktaraf
Loji Rawatan Kumbahan (GSG161) di
Kota Warisan, Daerah Sepang,
Selangor Darul Ehsan
(Reka & Bina)

SIZES:

DN900, DN700

NOV 2016

PROJECT TITLE:

Cadangan Pembangunan Perumahan
di atas Lot 19617 (PT 151) (HSD 20744)
dan Lot 19619 (PT 152) (HSD 20745),
Bandar Baru Salak Tinggi,
Mukim Dengkil, Daerah Sepang,
Selangor Darul Ehsan

SIZES:

DN450

DEC 2016

PROJECT TITLE:

Pakej B32 – Kerja-Kerja Menaiktaraf
Satu (1) Unit Loji Rawatan Kumbahan
Sediada (SAM058) kepada Kategori 1
di Kawasan Selangor
(Reka & Bina)

SIZES:

DN600, DN400, DN250

DEC 2016

PROJECT TITLE:

Wastewater Treatment Plant at
Tun Razak Exchange (TRX),
Kuala Lumpur

SIZES:

DN700, DN400, DN350, DN300, DN200, DN150, DN100

JAN 2016

PROJECT TITLE:

Cadangan Membina 12 unit
Rumah Teres 2 Tingkat di atas
PT 41296 (Lot 82925),Lorong Aman 1,
Kampung Sri Aman Dalam, Puchong
dalam Mukim Puchong, Daerah Petaling,
Selangor Darul Ehsan

SIZES:

DN200, DN150

FEB 2016

PROJECT TITLE:

The Proposed Construction and
Completion of Ganchong Water
Treatment Works, Main Distribution
Pipeline, Booster Pump Stations and
Associated Works in Pekan,
Pahang Darul Makmur

SIZES:

DN400, DN200

MAR 2016

PROJECT TITLE:

Water Reticulation at Lot 10689,
Jln Permata 1/4, Kawasan Perindustrian Arab
Malaysia, Negeri Sembilan Darul Khusus

SIZES:

DN150

APR 2016

PROJECT TITLE:

Sungai Asap Water Supply,
Bakun, Bahagian Kapit, Sarawak

SIZES:

DN400, DN300, DN150

APR 2016

PROJECT TITLE:

Proposed Construction and
Completion of 24ML R.C. Reservoir R3(B)
and Related Ancillary Works at
Cyberjaya Flagship Zone, Mukim Dengkil,
Daerah Sepang, Selangor Darul Ehsan

SIZES:

DN700, DN600, DN500, DN400, DN250

MAY 2016

PROJECT TITLE:

Pakej 9 (ii)-R : Menyiapkan Kerja-kerja
Terbengkalai untuk Projek Membina,
Menyiapkan dan Mentauliah 2.5 Juta Liter Tangki Air
Menara Konkrit Bertetulang serta Kerja-kerja
Berkaitan di Cherating, Kuantan, Pahang Darul Makmur

SIZES:

DN500, DN300

SEP 2016

PROJECT TITLE:

Proposed Construction and Completion of
Main Infrastructure Works (Vehicular Bridge (Bridge No.1),
Road, Drainage, Water Reticulation, Sewerage, Street Lighting,
Telephone and Ancillary Works) for Construction to GCE
(Part of Phase 1a-Parcel 2) for Proposed Development of
Elmina West on Lot 368, PT50037 (Part of Old Lot 360),
Lot 2132, Mukim Sungai Buloh and Lot 2685, Mukim Bukit Raja,
Daerah Petaling, Selangor Darul Ehsan

SIZES:

DN450, DN300, DN250, DN150

OCT 2016

PROJECT TITLE:

Proposed Construction and Completion of
400mm, 500mm, 600mm dia DI & 1100mm
dia MS Outgoing Pipe and
Other Associated Works, Mukim Tanjung Dua
Belas, Daerah Kuala Langat,
Selangor Darul Ehsan

SIZES:

DN600, DN500, DN400

JAN 2015

PROJECT TITLE:

Projek Menaik Taraf Loji
Rawatan Air Sarikei, Sarawak

SIZES:

DN200, DN400

FEB 2015

PROJECT TITLE:

Proposed Construction and
Completion of Structural Works
for 1.50MGD Elevated Reservoir
on Lot 812, Mukim Senai,
Daerah Kulaijaya, Johor Darul Takzim

SIZES:

DN600, DN500

MAR 2015

PROJECT TITLE:

Design, Build & Turnkey Contract
for The Proposed Upgrading &
Rehabilitation of Batu Kitang Water
Treatment Plant 3 (Modules 5 & 6)

SIZES:

DN300, DN450

APR 2015

PROJECT TITLE:

Pakej M020: Cadangan Pembinaan
Kolam Air Baru Lendu Berkapasiti
22.73 Juta Liter Dan Kolam Air Baru
High Level Berkapasiti 4.546 Juta Liter
Di Mukim Alor Gajah, Melaka

SIZES:

DN700, DN400, DN200

MAY 2015

PROJECT TITLE:

Cadangan 1 unit 1.5 MGD
Tangki Sedutan 1 unit 1.5 MGD
Tangki Servis & 1 unit Rumah Pam
bagi Pembangunan Pelancongan
Desaru Di Sebahagian
Lot PTD 2450, Mukim Pantai Timur
Kota Tinggi Johor Darul Takzim.

SIZES:

DN900, DN800, DN450, DN400

JUN 2015

PROJECT TITLE:

Water Reticulation Work for Cadangan
4 Blok Apartment (482 Unit) Rumah
Kelab Serta Kemudahan-Kemudahan
Penduduk di atas Lot12088,
Mukim Semenyih, Daerah Hulu Langat,
Selangor Darul Ehsan

SIZES:

DN150

JUN 2015

PROJECT TITLE:

Proposed Construction and Completion of 1.0MG R.C. Suction Tank,
Pump House for the Proposed Development
of Nilai Impaian & Nilai Utama, Mukim Setul,
Seremban, Negeri Sembilan Darul Khusus

SIZES:

DN600

JUL 2015

PROJECT TITLE:

Cadangan Membina dan Menyiapkan Pusat Penyelidikan
dan Pembangunan 1 Tingkat (Fasa 2) di atas
Sebahagian Lot 2664 (GRN47697) Mukim Klang,
Daerah Klang, Selangor Darul Ehsan (Pulau Carey)

SIZES:

DN150

AUG 2015

PROJECT TITLE:

Bekalan Air Mukah, Bahagian Mukah
Sarawak Phase 2 Package 3:
Proposed New Booster Station,
Reservoir, Delivery Main, Reticulation
Pipeline and Associated Facilities
(Contract No:PWD/HO/B002/2015)

SIZES:

DN600, DN500, DN450,
DN300, DN100

OCT 2015

PROJECT TITLE:

Cadangan Pembangunan Bercampur
Di Atas Lot 1571, Mukim Rawang,
Daerah Gombak, Selangor Darul Ehsan (Bandar Tasik Puteri)
Falling Main from Reservoir R2

SIZES:

DN500, DN450

DEC 2015

PROJECT TITLE:

Cadangan Pembangunan 3
Blok Pangsapuri 300 unit
di atas Lot 8791, Mukim Kajang,
Daerah Hulu Langat, Selangor Darul Ehsan

SIZES:

DN200

MAR 2014

PROJECT TITLE:

Construction & Completion of 24ML
Elmina East R.C. Reservoir for
Proposed Elmina Development Project

SIZES:

DN700, DN450

MAR 2014

PROJECT TITLE:

Water Reticulation Works at Jalan
Persiaran Kerjaya, Cadangan Jalan Kaji
Bumi U1/70, Jalan Perpustakawan
U1/62, Jalan Doktor U1/67,
Jalan Merinyu U1/71 dan Jalan Saintis
U1/69, Seksyen U1, Shah Alam,
Mukim Damansara, Daerah Petaling,
Selangor Darul Ehsan

SIZES:

DN350, DN250, DN200, DN150

OCT 2014

PROJECT TITLE:

Proposed Construction and Completion
of 15ML RC Ground Reservoir for
The Proposed Development of Ampar
Tenang, Mukim Dengkil, Daerah
Sepang, Selangor Darul Ehsan

SIZES:

DN800, DN700, DN600, DN500,
DN300

NOV 2014

PROJECT TITLE:

Membina dan Menyiapkan Satu(1)
Buah Tangki Menara Konkrit ‘B’
Berkapasiti 2.27ML di Kawasan
Perindustrian Kemunting serta
Kerja-Kerja Berkaitan

SIZES:

DN800, DN600, DN300

DEC 2014

PROJECT TITLE:

Proposed Sludge Treatment for Bukit
Sebukor, Bertam 1&2 and Asahan
Water Treatment Plants in Melaka

SIZES:

DN600, DN300, DN150, DN100

JAN 2013

PROJECT TITLE:

Saratok Regional Water Supply
Phase 1, Sarawak

SIZES:

DN600, DN450, DN300, DN150

JUN 2013

PROJECT TITLE:

Proposed Extension of Kuala Jelai
Water Treatment Plant Package 4 :
Proposed River Gate and Water
Treatment Plant Upgrading

SIZES:

DN150, DN200

AUG 2013

PROJECT TITLE:

Internal Water Reticulation at
MRT FD1 – Depot at Sungai Buloh,
Selangor Darul Ehsan

SIZES:

DN200, DN250

AUG 2013

PROJECT TITLE:

Package 5 – Distribution Improvement
from Pengkalan Bukit A Reservoir to Kg.
Mesjid (Project 4) and Supply
Improvement System at Bakri,
Muar (Project 5)

SIZES:

DN450, DN400, DN350, DN300

SEP 2013

PROJECT TITLE:

Proposed pipe replacement
programme for year 2010 in Negeri
Sembilan, Package 3A-Proposed Pipe
Replacement Works in District of
Tampin and Jempol

SIZES:

DN200, DN150, DN100

DEC 2013

PROJECT TITLE:

Completion of R2 & R8 Elevated Water
Storage Tanks in Kuantan Port City,
Pahang for The East Coast Economic
Region Development Council

SIZES:

DN500, DN300

MAR 2012

PROJECT TITLE:

Projek Membina dan Menyiapkan
Bekalan Air Luar Bandar (BALB)
Wilayah Serian, Samarahan, Sarawak –
Serian Water Treatment Plant

SIZES:

DN600, DN500, DN450, DN300,
DN250, DN200

APR 2012

PROJECT TITLE:

Water Reticulation Works For Proposed
Development of 41 Units Double Storey
Terrace Houses And Local Infrastructure
Works at Phase A1-04(a), Alam Impian,
Seksyen 35, Shah Alam, Selangor
Darul Ehsan

SIZES:

DN250, DN200, DN150

APR 2012

PROJECT TITLE:

Projek Membina dan Menyiapkan
Bekalan Air Luar Bandar (BALB)
Kawasan Lubok Antu,
Bahagian Sri Aman, Sarawak

SIZES:

DN200, DN150, DN100

APR 2012

PROJECT TITLE:

Proposed Construction And
Completion Of 1.09 Million Gallons
Reservoir At Taman Mutiara Mas,
Mukim Pulai, Johor Bahru,
Johor Darul Takzim

SIZES:

DN500, DN450, DN300

APR 2013

PROJECT TITLE:

Cadangan Membina 162 Unit Rumah
Teres 2 Tingkat Di Fasa 1A, 2 Unit
Wakaf, 1 Unit Gelanggang Futsal
Berbumbung Dan 1 Unit Pencawang
TNB Di Atas Sebahagian Lot 243, 395
Dan 397, Seksyen U17, 40160 Shah
Alam, Selangor Darul Ehsan – 800,000
Gallons RC Reservoir

SIZES:

DN500

JUN 2012

PROJECT TITLE:

Proposed Construction and Completion
of 213 Units of Houses, 10 Units of
Management Quarters, Amenities and
Infrastructure Works For Development
of Pekan Agropolitans Projects (PAP)
at Kawasan 21, Tanjung Batu, Mukim
Bebar, Pahang Darul Makmur – Water
Reticulation Works, RC Elevated Water
Tank and RC Suction Tank

SIZES:

DN200, DN150

JUL 2012

PROJECT TITLE:

Water Reticulation Works For Proposed
Housing Development on Lot 1244
& 1399, Mahkota Cheras, Dearah Hulu
Langat, Selangor Darul Ehsan – 22 Unit
Zero Lot (45′ x 80′) And 66 Units
Semi-Detached Houses (40′ x 80′)

SIZES:

DN250, DN200, DN150, DN100

JAN 2011

PROJECT TITLE:

Cadangan Membina 40 Unit Rumah
Berkembar 3 Tingkat Di Atas
Sebahagian Lot 345 & 346, Mukim Ulu
Kelang, Daerah Gombak, Selangor
Darul Ehsan – Pumping Main From
Suction Tank & Water Reticulation
For Phase 5

SIZES:

DN200, DN150

JUL 2011

PROJECT TITLE:

Water Reticulation Works For Cadangan
Membina 63 Unit Rumah Teres Dua
Tingkat Bagi Fasa 7A12 Di Atas
Lot PT 5006 – PT 5026, PT 5028 –
PT 5055, PT 5057 – PT 5070
(Sebahagian Lot 3198, 3197 dan
1804), Bandar Kinrara, Mukim Petaling,
Daerah Petaling, Selangor Darul Ehsan

SIZES:

DN150

AUG 2011

PROJECT TITLE:

Main Water Reticulation for Maktab
PDRM, Cheras, Kuala Lumpur

SIZES:

DN400, DN300, DN250, DN150

NOV 2011

PROJECT TITLE:

Cadangan Pembangunan Puncak
Bestari, Bandar Puncak Alam untuk
Worldwide Holdings Berhad –
Reservoir, Suction Tank & Main
Reticulation Line

SIZES:

DN400, DN350, DN300, DN250,
DN200

APR 2010

PROJECT TITLE:

The Construction and Completion of
the Proposed Trusan Regional Water
Supply, Lawas, Bahagian Limbang,
Sarawak (Trusan WTP)

SIZES:

DN600, DN350, DN300, DN150,
DN100, DN80

APR 2010

PROJECT TITLE:

Execution and Completion of 2.2 Million
Gallons Reservoir, 1.2 Million Gallons
Suction Tank and Pump House and
Other Related Works For Proposed
Mix Development on Lot
PT 4466, Mukim Dengkil, Daerah
Sepang, Selangor Darul Ehsan

SIZES:

DN700, DN600, DN500, DN350,
DN300

MAY 2010

PROJECT TITLE:

Proposed Sludge Treatment Works for
Yong Peng 2 & 3 Water Treatment Plant
and Distribution Improvement Works in
Johor Darul Takzim

SIZES:

DN700, DN600, DN450, DN300,
DN250

MAY 2010

PROJECT TITLE:

Water Reticulation for Putra Heights –
R2 (Reservoir), Selangor Darul Ehsan

SIZES:

DN300, DN250

JAN 2009

PROJECT TITLE:

Cadangan Pembangunan Bercampur
Di Atas Tanah Kerajaan Seluas 100
Ekar, Mukim Ulu Lepas, Daerah Kuantan,
Pahang Darul Makmur
– Proposed 500,000 Gallons Suction
Tank and 1,500,000 Gallons Reservoir

SIZES:

DN600, DN450, DN400, DN350,
DN300

MAR 2009

PROJECT TITLE:

Construction and Completion of RC
Water Reservoir (1,000,000 Gallons),
Pump house and Associated Works
For Cadangan Pembangunan Bercampur
Di Atas Lot PT 543 (Lot 8111),
Cahaya SPK, Seksyen U9, Shah Alam,
Selangor Darul Ehsan

SIZES:

DN600, DN450, DN400, DN150

APR 2009

PROJECT TITLE:

Cadangan Membina 431 Unit Rumah
Teres 2 & 3 Tingkat, Fasa 1A (349 Unit)
& Fasa 1B (82 Unit) Berserta 2 Unit
Pencawang TNB 1 Tingkat
Di Atas Sebahagian Lot PT 9814 &
PT 9815, Seluas 100 Ekar, PJU 10,
Mukim Sungai Buloh, Daerah Petaling,
Selangor Darul Ehsan – RC Suction
Tank, RC Reservoir and Pump house

SIZES:

DN350, DN300

APR 2009

PROJECT TITLE:

Enhancement Works at Johor River
Water Works (Plants A & B)

SIZES:

DN300, DN200, DN150

DEC 2009

PROJECT TITLE:

Construction of Petaseh Intake
Pumping Station for Triang WTP,
Kuala Klawang, Negeri Sembilan
Darul Khusus

SIZES:

DN300, DN250

FEB 2008

PROJECT TITLE:

Cadangan Pembangunan Di Atas Lot
PT 16241, PT 16242, Sebahagian Lot
PT 20784 (Lot PT 16246, PT 16247
& PT 16248), Lot PT 16251,
Jalan Ipoh – Rawang, Mukim Batu,
Kuala Lumpur

SIZES:

DN350, DN300, DN200

JUN 2008

PROJECT TITLE:

Cadangan Pembangunan Perumahan
Dan Perniagaan Di Atas Lot 9568 –
Lot 9763, Mukim Dengkil, Daerah
Sepang, Selangor Darul Ehsan –
Elevated Tank, Suction Tank
& Pump house

SIZES:

DN350, DN300, DN250, DN200,
DN150

JUL 2008

PROJECT TITLE:

Skim Bekalan Air Batu Hampar (Skim A)
– Construction & Completion of Batu
Hampar Dam and Associated Works
(Package 1), Rembau

SIZES:

DN600

NOV 2008

PROJECT TITLE:

Cadangan Membekal, Membina Dan
Menyiapkan Bangunan Kemudahan
Dan Penginapan Pelajar, Kerja- Kerja
Mekanikal Dan Elektrikal, Kerja-Kerja
Berkaitan Maktab Rendah Sains MARA
Felda (MRSMF) Di Feldajaya Utara,
Mukim Sungkai, Daerah Batang
Padang, Perak Darul Ridzuan – RC
Elevated Water Tank and Suction Tank

SIZES:

DN200, DN150

NOV 2008

PROJECT TITLE:

Cadangan Mendirikan 51 Unit
Kedai (Tingkat Bawah) dan 206 Unit
Apartment Kos Sederhana Rendah
(Di Tingkat 1 & 2), Di Atas Lot 2045,
Mukim Cheras, Daerah Hulu Langat,
Selangor Darul Ehsan – Upgrading to
Existing Taman Okid Water Supply
Pumping System

SIZES:

DN250

AUG 2007

PROJECT TITLE:

Main Water Reticulation for CIQ
Complex, Kg. Durian Burung,
Padang Terap, Kedah Darul Aman

SIZES:

DN150

NOV 2007

PROJECT TITLE:

Proposed Suction Tank and
Pump house For Cadangan
Membina 38 Unit Rumah Berkembar
Di Atas Lot 1175, Mukim Ulu Kelang,
Daerah Gombak, Selangor Darul Ehsan

SIZES:

DN200, DN150

JAN 2015

PROJECT TITLE:

Pakej D52 – Pembinaan Rangkaian
Paip Pembetungan dan Rasionalisasi
Loji Rawatan Kumbahan di Puchong,
Selangor Darul Ehsan
(Reka & Bina) Zon 1 & 2

SIZES:

DN800

FEB 2015

PROJECT TITLE:

Kerja-Kerja Menaiktaraf Loji Rawatan
Kumbahan Sedia ada (KLR 284)
Kepada 100,000 PE Di Atas Lot-Lot
438 dan 439, Segambut Dalam,
Mukim Batu, Kuala Lumpur

SIZES:

DN300

MAR 2015

PROJECT TITLE:

Proposed Construction And
Completion Of Sewage Pump Station
And Other Associated Works (Package
1C) For the Proposed Development
Of Ampar Tenang, Mukim Dengkil,
Daerah Sepang, Selangor Darul Ehsan

SIZES:

DN600, DN450, DN300,
DN200, DN80

MAR 2015

PROJECT TITLE:

The Proposed Design, Construct,
Test And Commision of Proposed
Sewage Lift Pump Station and
Sewage Treatment Plant Together
with Required Ancillary Works on
Part of Lot 32827 and Part of PT
32127, Daerah Seremban,
Negeri Sembilan Darul Khusus
For Proposed Mixed Development
(Resident and Commercial) for Bandar
Ainsdale And S2 Heights (Phase 3A),
Mukim Rasah, Daerah Seremban,
Negeri Sembilan Darul Khusus

SIZES:

DN600, DN500, DN400, DN300,
DN200, DN100, DN80

MAR 2015

PROJECT TITLE:

Pakej D48 – Cadangan Pembinaan
Rangkaian Paip Pembentungan di
Kawasan Petaling Jaya (Selatan),
Selangor Darul Ehsan (Reka & Bina)
Penchala Catchment – Zones A, B & C

SIZES:

DN400, DN300, DN150

APR 2015

PROJECT TITLE:

Pumping Station for Cadangan Pembangunan
di atas Lot 6604, PT 945 -968, PT 980,
PT 994 (Fasa 2), Pekan Port Dickson,
Daerah Port Dickson, Negeri Sembilan Darul Khusus

SIZES:

DN150

JUL 2015

PROJECT TITLE:

Pakej D46 – Pembinaan Rangkaian
Paip Pembetungan dan Rasionalisasi
Loji Rawatan Kumbahan di Kawasan
Tadahan Damansara, Kuala Lumpur
dan Selangor (Reka & Bina)

SIZES:

DN700

JUL 2015

PROJECT TITLE:

Pakej D44 – Cadangan Pembinaan
Rangkaian Paip Pembetungan
dan Rasionalisasi di Bunus,
Kuala Lumpur (Reka & Bina)
– KLR289 Pump Station

SIZES:

DN1100, DN700, DN600

JUL 2015

PROJECT TITLE:

Pakej B34 – Kerja-Kerja Menaiktaraf
5 Unit Loji Rawatan Kumbahan Sedia
Ada (GSG062, GSG070, PTG030
& GBK197) Kawasan Selangor
(Reka dan Bina)

SIZES:

DN450, DN350, DN300, DN250,
DN200, DN100

AUG 2015

PROJECT TITLE:

Proposed Design, Construction,
Completion, Operation and Maintenance of
Phase 2 Upgrading to Existing Sewage
Treatment Plant including All Ancillary
Works for Proposed Development of
Nilai Impian & Nilai Utama, Mukim Setul,
Daerah Seremban, Negeri Sembilan Darul Khusus

SIZES:

DN450, DN400, DN300

OCT 2015

PROJECT TITLE:

Pakej B31 – Kerja-Kerja Menaiktaraf
Satu (1) Unit Loji Rawatan Kumbahan
Sedia Ada (KLR142) kepada Kategori
1 di Kawasan Kuala Lumpur
(Reka & Bina)

SIZES:

DN1200, DN600, DN450, DN350,
DN250, DN200

NOV 2015

PROJECT TITLE:

Cadangan Kerja-Kerja Menaiktaraf
Loji Rawatan Kumbahan (PEG 073),
Batu Ferringhi, Pulau Pinang
(Reka & Bina)

SIZES:

DN700, DN500

DEC 2015

PROJECT TITLE:

Cadangan Pembangunan Sebuah
Loji Rawatan Kumbahan Baru (STP7)
di atas Sebahagian Lot PT2078/58,
PT2080/60, Lot 9574 dan Lot 9575,
Genting Highlands, Mukim Bentong,
Daerah Bentong, Pahang Darul Makmur

SIZES:

DN600, DN450, DN300, DN150, DN100

APR 2014

PROJECT TITLE:

Design, Obtaining Approval, Supply,
Delivery, Construction, Completion,
Testing and Commissioning and
Maintenance for Intermediate Sewerage
Pumping Station (14,000 PE)
Force Main and Sewerage Treatment
Plant (12,000 PE) Installation in
Accordance with Approved Plans
and Maintenance until Taken Over
by Authorities for Proposed Housing
Development at Mukim Linau, Linau IV,
Simpang Kanan, Daerah Batu
Pahat, Johor Darul Takzim

SIZES:

DN400

JUL 2014

PROJECT TITLE:

The Proposed Design and Build of
Service Bridge for Sewer Main and
Relocation of Existing Sewer Main
Bridge 7A at the Coastal Highway,
Iskandar Malaysia

SIZES:

DN150

AUG 2014

PROJECT TITLE:

Proposed Turnkey Contract For Design,
Construct, Equiping And Maintenance
Of Sewage Pump Station 13 (PS 13)
At Cyberjaya Flag Ship Zone,
Mukim Dengkil, Daerah Sepang,
Selangor Darul Ehsan

SIZES:

DN250

SEP 2014

PROJECT TITLE:

Proposed Turnkey Contract For Design,
Construct, Equiping And Maintenance
Of Sewage Pump Station (PS1 And
PS6a) At Cyberjaya Flag Ship Zone,
Mukim Dengkil, Daerah Sepang,
Selangor Darul Ehsan

SIZES:

DN600, DN450

NOV 2014

PROJECT TITLE:

Proposed Turnkey Contract For Design,
Construct, Equiping And Maintenance
Of Sewage Pump Station (PS2-6)
At Cyberjaya Flag Ship Zone,
Mukim Dengkil, Daerah Sepang,
Selangor Darul Ehsan

SIZES:

DN600

DEC 2014

PROJECT TITLE:

Pakej B29 – Kerja-kerja Menaiktaraf
Tiga (3) Unit Loji Rawatan Kumbahan
Sedia Ada kepada Kategori 1 di
Kawasan Selangor (Reka & Bina)

SIZES:

DN350, DN200

JAN 2013

PROJECT TITLE:

Sewage Force Main at Lot 8747,
Mukim 15, Seberang Perai Selatan,
Pulau Pinang

SIZES:

DN450

JUN 2013

PROJECT TITLE:

Design, Submission, Obtaining
Approval, Construction of Proposed
Pumping Station (PS2 – Module 1 –
Capacity of 45000 PE & Ultimate
Capacity of 90000 PE) Force Main and
Associated Works in Accordance with
Approved Plans and Maintenance until
Taken Over by Authorities for
Dreammont at IOI Resort, Putrajaya

SIZES:

DN800

SEP 2013

PROJECT TITLE:

Sewage Force Main at
Persiaran Tasik, Cyberjaya

SIZES:

DN600

JAN 2012

PROJECT TITLE:

Pakej G03 – Cadangan Kerja-Kerja
Membaikpulih Rangkaian Paip
Pembetungan (Sewer Rehabilitation
Via Trenchless Technology)
Dan Kerja-Kerja Lain Yang Berkaitan
Di Wilayah Persekutuan Labuan

SIZES:

DN300, DN150

APR 2012

PROJECT TITLE:

Cadangan Pembinaan Paip
Pembetungan Utama dan
Stesyen-stesyen Pam,
Mukim Klang, Selangor – PS 5

SIZES:

DN900, DN700, DN400

JAN 2011

PROJECT TITLE:

Centralised Sewage & Sludge
Treatment Facility and Sewerage
Network in Alor Gajah, Melaka

SIZES:

DN400, DN350, DN250, DN200,
DN150

JUL 2011

PROJECT TITLE:

Rectification Works at Central Sewage
Treatment Plant, Seksyen 8, Bandar
Baru Bangi, Selangor Darul Ehsan

SIZES:

DN250, DN100

APR 2010

PROJECT TITLE:

The Design, Supply, Construction,
Completion,Testing and Commissioning
of the 3rd Module (50,000 P.E.) of the
Centralised Sewage Treatment Plant
KXG 671, Sewage Pumping Station
PS1 (38,443 P.E.), Sewerage Force
Main from PS1 to KXG 671 and the
Associated Works for Bandar Botanic,
Parcel B, Mukim Klang, Daerah Klang,
Selangor Darul Ehsan

SIZES:

DN500

JUL 2010

PROJECT TITLE:

Sewage Force Main & Pump Station
at Seksyen U4, Subang Bestari,
Selangor Darul Ehsan

SIZES:

DN400, DN200

AUG 2010

PROJECT TITLE:

Projek Menyiapkan Rangkaian Paip
Pembentungan Terbengkalai, Sunggala,
Port Dickson, Negeri Sembilan
Darul Khusus

SIZES:

DN800, DN500, DN400, DN300,
DN150, DN100

APR 2010

PROJECT TITLE:

The Design, Supply, Construction,
Completion,Testing and Commissioning
of the 3rd Module (50,000 P.E.) of the
Centralised Sewage Treatment Plant
KXG 671, Sewage Pumping Station
PS1 (38,443 P.E.), Sewerage Force
Main from PS1 to KXG 671 and the
Associated Works for Bandar Botanic,
Parcel B, Mukim Klang, Daerah Klang,
Selangor Darul Ehsan

SIZES:

DN500

JUL 2010

PROJECT TITLE:

Sewage Force Main & Pump Station
at Seksyen U4, Subang Bestari,
Selangor Darul Ehsan

SIZES:

DN400, DN200

AUG 2010

PROJECT TITLE:

Projek Menyiapkan Rangkaian Paip
Pembentungan Terbengkalai, Sunggala,
Port Dickson, Negeri Sembilan
Darul Khusus

SIZES:

DN800, DN500, DN400, DN300,
DN150, DN100

MAR 2009

PROJECT TITLE:

Pakistan Sludge Treatment Facilities

SIZES:

DN500, DN300, DN250,
DN200, DN150

APR 2008

PROJECT TITLE:

Pakej B18 – Cadangan Kerja-kerja
Merekabentuk, Membina & Mentauliah
Sistem Paip Pembetungan Bertekanan
dan Stesen Pam Efluen dari Loji
Rawatan Kumbahan Kelana Jaya
PJA121 ke Sg. Kayu Ara,
Selangor Darul Ehsan

SIZES:

DN700, DN500, DN350, DN200

DEC 2008 - NOV 2009

PROJECT TITLE:

Centralised Sewerage Treatment
Plants at Zabadani, Hafier Foqa
and Daaraya (Syria)

SIZES:

DN1200, DN1000, DN700, DN600,
DN500, DN400, DN350, DN250,
DN200, DN150, DN100, DN80

environmentally sound ductile iron pipelines for sustainable development

PRODUCTS

The sustainable attributes of Ductile Iron pipe begin with the fact that Ductile Iron pipe is made from recycled scrap materials. According to a 2008 study by Arizona State University Project Engineer, Dae-Hyun Koo et al., Ductile Iron pipe had the lowest impact on natural resource depletion compared to HDPE pipe and PVC pipe.

Because of its material strength, properly designed Ductile Iron pipe will typically have larger than nominal inside diameter. This promotes greater hydraulic flow while reducing the pumping energy and costs.

Ductile Iron pipe contributes to an improved environmental performance in terms of energy consumed and emissions produced during manufacture due to its longer life span. With modern metallurgy and engineering, Ductile Iron pipelines are designed to provide a minimum of 100 years of reliable service. In November 2012, Ductile Iron pipe manufactured in the United States received certification as a sustainable product from the Institute for Market Transformation to Sustainability.

The Ductile Iron pipe industry continues to deliver an outstanding service, while constantly exploring innovative ways to improve its product and simultaneously reduce its carbon footprint.

A new era begins with BS EN 545:2010

Malaysia currently implements ‘BS EN 545:2010 – Ductile Iron pipes, fittings, accessories and their joints for water pipelines – Requirements and test methods’, as recommended by SPAN and SIRIM. The BS EN 545:2010 comes with greener features for sustainability as well as some enhanced quality performance.

The new manufacturing standard
Advantages of Ductile Iron pipeline

The new manufacturing standard

Introduction of pressure classes

  • Simple correspondence between diameter and allowable operating pressure (PFA)
  • Replacing thickness classes (K9 etc) with pressure classes
  • Preferred pressure classes C25, C30 and C40 (clause 8.1, table 16)
  • Additional pressure classes (clause 8.1, table 17) for specific requirements including C20, C50, C64 and C100

Measures for sustainable development

  • Savings on materials and energy, thus reducing the carbon foot print collectively
  • Extended lifespan with increased metallic zinc coating thickness i.e. not less than 200g/m2 (clause 4.5.2.2)
  • Introduction of alternative coatings for different application needs (annex D)

Emphasis on drinking water directive 98/83/EC

  • Water used in the mortar mix for the internal lining shall comply with Drinking Water Directive 98/83/EC (clause 4.5.3.1)

Compulsory performance tests and FPC

Highest quality certified

  • Conformity of pipes, joints and accessories by compulsory performance tests and factory production control (FPC)
    (clause 9.1)
  • Integrating couplings, flange adaptors, saddles for use with the Ductile Iron pipes and fittings

Advantages of Ductile Iron pipeline

Speedy installation

feature

  • Easy assembly without the need of welding and skilled worker.
  • Deflection in any direction up to 5 degrees.

 

benefit

  • Time and cost-saving speedy pipe installation. Concern-free with regard to corrosion at pipe joint.
  • Adapts to ground settlement for contingency compared to the rigid welding on steel pipeline.

Robust material

feature

  • Strong against external load due to its inherent bending strength.
  • High carbon content in percentage.
  • Tough material for various application.
  • Less critical in terms of bedding condition.
  • Maintenance-free.

benefit

  • Suitable for underground pipe installation in urban areas with heavy traffic load.
  • Excellent corrosion resistance compared to other metallic products i.e. steel pipe.
  • Minimises water theft versus the application of polymer products.
  • Reduces costs in sand bedding preparation as in the cases of steel and polymer pipes’ installation.
  • For modern water systems that lasts, weighing against the costly maintenance on steel and polymer pipelines.

Over 100 years service expectancy

feature

  • A stable protective layer of insoluble zinc salts.

 

benefit

  • Self-healing characteristics of any damage and thus, increases the life span.
  • A stable protective layer of insoluble zinc salts.

 

benefit

  • Self-healing characteristics of any damage and thus, increases the life span.

UDI Ductile Iron socket-spigot pipes for potable water

feature

Durable and reliable piping material for modern water systems that last. Easy to assemble yet with leak-tightness performance even at pipe bursting pressures. Ideal for underground application in restricted space or during adverse weather conditions. Deflection in any direction up to 5 degrees. Reducing pipe laying costs and time while increasing efficiency.

specification

BS EN 545:2010, socket-spigot joints, externally metallic zinc coated and bituminous, internally cement mortar
lined c/w push-in rubber rings.

preferred class

Classes 40, 30, 25.

sizes available

UDI Ductile Iron socket-spigot pipes for sewerage application

feature

Excellent corrosion resistance coupled with standard cement-mortar lining ensures an exceptional friction coefficient and resistance to scour and cement deterioration from most domestic sewage. Easy to install, ideal for underground application in restricted space or during adverse weather conditions. High material strength resists heavy impact and handles extreme external loadings. Deflection in any direction up to 5 degrees. Reducing pipe laying costs and time while increasing efficiency.

specification

BS EN 598:2007 +A1:2009, socket-spigot joints, externally metallic zinc coated and bituminous, internally cement * mortar lined c/w push-in rubber rings. ( * High alumina cement, sulphate resisting cement, other options including epoxy or polyurethane coatings)

sizes available

UDI Ductile Iron flanged pipes

feature

Suitable for above ground applications in water and sewage treatment works, pumping stations, fire mains etc. Rigid, self-anchoring joints that provide easy installation and removal of valves, hydrants etc. Also allows pipe sections to be installed or dismantled in-line. Customisation according to your projects’ requirement i.e. double-flanged, single-flanged, puddle flanges. Excellent corrosion
resistance and high material strength resists heavy impact and handles extreme external loadings.

specification

BS EN 545:2010 or BS EN 598:2007 +A1:2009, externally metallic zinc coated and bituminous, internally cement * mortar lined c/w push-in rubber rings. ( * Ordinary portland cement, high alumina cement, sulphate resisting cement, other options including epoxy or polyurethane coatings)

Screw-on or weld-on flanges with precision workmanship that offers leak-proof quality.

Flange standard includes:

  • EN 1092-2, in PN10,
    PN16 or PN25
  • ANSI 125 / 150
  • JIS 5K / 10K

sizes available

UDI Ductile Iron fittings

feature

Designed to integrate seamlessly with all of UDI Ductile Iron pipelines. Available in socketed or flanged joints to suit your requirements. Comprehensive range of Ductile Iron fittings that include:

  • bend ( 90藲, 45藲, 22 陆藲, 11 录藲 )
  • tee ( equal, reducing, radial, level invert, 45藲 angle branch, 鈥淵鈥?)
  • taper ( concentric, flat )
  • duckfoot bend ( 90藲 )
  • long radius bend ( 90藲 )
  • flanged bellmouth
  • blank flange
  • flanged spigot
  • flanged socket
  • socket collar

specification

BS EN 545:2010 or BS EN 598:2007 +A1:2009, externally zinc rich paint coated and bituminous, internally cement * mortar lined c/w push-in rubber rings. ( * Ordinary portland cement, high alumina cement, sulphate resisting cement, other options including epoxy or polyurethane coatings)

Flange standard includes:

  • EN 1092-2, in PN10, PN16 or PN25
  • ANSI 125 / 150
  • JIS 5K / 10K

sizes available

UDI Ductile Iron accessories

feature

Complementing the UDI Ductile Iron pipelines for quick connectivity or repair. Assortment of Ductile Iron accessories that includes:

  • flange adaptor
  • coupling
  • saddle
  • bell restraint clamp
  • socket-spigot tee with socket branch
  • socket-spigot duckfoot bend

specification

BS EN 545:2010 or BS EN 598:2007 +A1:2009.

Flange standard includes:

  • EN 1092-2, in PN10, 16 or PN25
  • ANSI 125 / 150
  • JIS 5K / 10K

sizes available

Product Certs

National Water Services Comm 2

Product catalogue

Product Tec. Lit

GET IN TOUCH

map25-redish

No. 42 Jalan Layang-layang 4,
Bandar Puchong Jaya
47100 Puchong, Selangor Darul Ehsan

telephone65-blue

T: +603 5882 6277
F: +603 5882 6244

envelope4-green

E: united@udi.net.my